View Full Version : Blivit part 2


MAC
01-03-2008, 08:15 PM
Well we stripped the forms off yesterday. Came out just right.

First photo shows what the forms looked like. Second shows what the hole looked like when we got back to work yesterday after a long weekend....

MAC
01-03-2008, 08:17 PM
Here are a couple more of the tank center after it was stripped. Needless to say all the rebar made stripping the shelf off a tedious job. (lots of small pieces.)

This center will be the base support for the skimmer on a 55' diameter tank. tank walls will be 15' tall.

MAC
01-03-2008, 08:21 PM
The hard part was building the forms so everything was monolythic. So the center cone had to be supportedtotally by the outside with no center support. It also had to be breced so as not to float when the laborers vibrated it. The anchor bolts are 1 1/4" dia.x18" long. (stainless steel)

Tagger
01-03-2008, 08:24 PM
Looks like a good time ... I'm doing hardware at the airport ..:bo:

spence
01-03-2008, 08:35 PM
For the rest of us dumb%$%$%$%$s WTF is it?

-spence

MAC
01-03-2008, 09:33 PM
For the rest of us dumb%$%$%$%$s WTF is it?

-spence


LOL, It will be the center of a 55' round tank at a water filtration plant. Heavies will settle to the bottom,forming a sludge and be pumped through the pipe to settling ponds.

ProfessorM
01-04-2008, 10:05 AM
Blivit. LOL. My old Dutch friend will enjoy that when I tell him, he is the one who relayed that phrase to me. Interesting job.

The Iceman 6
01-04-2008, 12:45 PM
And Spence thanks for asking the question....

spence
01-04-2008, 01:12 PM
And Spence thanks for asking the question....
I had no clue...unless it was the mount for a giant toilet :hee:

-spence