fishonnelsons
06-16-2008, 08:00 AM
What is the preferred knot when attaching lead core to backing?
I normally take the lead out of the line for about 4 inches and then "try" to tie an albright, but it just doesn't seem like a great connection.
Thanks
I normally take the lead out of the line for about 4 inches and then "try" to tie an albright, but it just doesn't seem like a great connection.
Thanks