Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » fcap60

Conversation Between fcap60 and onelastcast
Showing Visitor Messages 1 to 2 of 2
  1. onelastcast
    04-29-2011 10:24 AM
    onelastcast
    Frank,

    Thanks for taking time to go through your 'laundry list" of yard/home improvements. Definitely interested. Preliminary thoughts on the work:

    Porch - updated 'grill' work - take down existing, build 3 new frames, , left of stairs hinged as a gate, using existing lattice and new 1 x 6's for frame - it's around 5 hours or so for this plus material.

    Moulding - less than 3' piece to cut and install - 1 hour plus material

    Railing/Column - railing shouldn't take more than 1-2 hours to install. New bases for columns can take a few hours. My concern is if we need to replace rotted wood on right column . so let's say 4 hours plus material

    Fence: take down driveway fence - 1 hour
    take down and rebuild sections (didn't think it was all of them) maybe 4 or 5 - 4 hours , dig holes, concrete and set posts - 4 hours - reinstall fencing 4 hours

    So, preliminary is probably around 3 days work plus material
    thinking around $600 plus $200 material

    let me know
  2. onelastcast
    04-23-2011 11:22 AM
    onelastcast
    Frank

    lastcast52@gmail.com
    2038584374

All times are GMT -5. The time now is 01:25 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com