Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating fcap60

Conversation Between fcap60 and onelastcast
Showing Visitor Messages 1 to 2 of 2
  1. onelastcast
    04-29-2011 10:24 AM
    onelastcast
    Frank,

    Thanks for taking time to go through your 'laundry list" of yard/home improvements. Definitely interested. Preliminary thoughts on the work:

    Porch - updated 'grill' work - take down existing, build 3 new frames, , left of stairs hinged as a gate, using existing lattice and new 1 x 6's for frame - it's around 5 hours or so for this plus material.

    Moulding - less than 3' piece to cut and install - 1 hour plus material

    Railing/Column - railing shouldn't take more than 1-2 hours to install. New bases for columns can take a few hours. My concern is if we need to replace rotted wood on right column . so let's say 4 hours plus material

    Fence: take down driveway fence - 1 hour
    take down and rebuild sections (didn't think it was all of them) maybe 4 or 5 - 4 hours , dig holes, concrete and set posts - 4 hours - reinstall fencing 4 hours

    So, preliminary is probably around 3 days work plus material
    thinking around $600 plus $200 material

    let me know
  2. onelastcast
    04-23-2011 11:22 AM
    onelastcast
    Frank

    lastcast52@gmail.com
    2038584374

All times are GMT -5. The time now is 11:06 AM.


Powered by vBulletin. Copyright 2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com