Striper Talk Striped Bass Fishing, Surfcasting, Boating

Striper Talk Striped Bass Fishing, Surfcasting, Boating (http://www.striped-bass.com/Stripertalk/index.php)
-   Plug Building - Got Wood? (http://www.striped-bass.com/Stripertalk/forumdisplay.php?f=19)
-   -   another... nearly finished... (http://www.striped-bass.com/Stripertalk/showthread.php?t=48076)

leptar 04-01-2008 12:55 AM

another... nearly finished...
 
1 Attachment(s)
Cleared yesterday with Krylon Acrylic clear and epoxied with Devcon 2ton epoxy 2 more flips and off to bed.... Sealed with Olympic Maximum, Primed sanded(100 grit) primed light sand(220grit) with BIN, airbrushed with Delta paint, first attempt at scale... Pike3 lip..

saltydog 04-01-2008 04:05 PM

Very Nice,
GOOD LUCK GOOD PLUGGIN:cheers2:

stripermagnet 04-01-2008 06:35 PM

keep those bad boys coming


All times are GMT -5. The time now is 05:14 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 1998-20012 Striped-Bass.com