![]() |
3/4" Stone and Crusher Run base material
I am finishing up a retaining wall project and have left over base and drainage stone in my driveway.
Estimated: 1 1/2 ton of Crusher Run Base left 2 ton of 3/4 drainage or driveway/walkway stone left http://www.jfprice.com/_images/34_stone_gray.JPG I paid $240 for everything. $50 and it's all your's! Obviously you need a small dump truck or heavy duty pick up to manage the load. If no one is interested I have to move it to an area behind my shed to fill a hole. Seems like a shame if goes behind there and not put to good use. Maybe someone out there could use it. It came from JF price in Weymouth. |
Everybody Must Get Stoned
We put almost all of this to use in the neighborhood this weekend. We had the wheelbarrel and pick up truck brigade going on. It patched up drive ways flower beds and I saved a little more for my wifes flower bed. Everything looks awesome. I never knew I lived next to so many stoners before!:laugha:
|
glad you got your rocks off :nopain:
|
All times are GMT -5. The time now is 11:22 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 1998-20012 Striped-Bass.com