![]() |
Deck Project
2 Attachment(s)
I spaced on taking before pics but trust me when I say this deck was completely covered with black mold. 2 days of hard work on one of the freakin hottest weekends and 1 hour last night and it's done! I even sacrificed some feeling in my left pointer finger which is still semi-asleep at the tip!
|
Really nice, I like the natural wood look. Did you power wash with chemicals?
Now you want to come and do mine?:rotf2: |
Most excellent work John
are you sealing it?
and whats the do0-hicky box contraption something fer bugs i'd imagine |
Wow that came out great I bet you feel great about a job well done
|
Looks good!!.....even with the do hicky candle box thingy;)
|
WOW looks great, I have to do mine
|
Yeah, looks awsome. How did you do it. Mine is in need of some serious cleaning!!!!
|
Thanks guys and it is a great feeling when your hard work results in something nice. Day 1 consisted of just straight on power washing with good ole H2O, no chemicals. The mold peeled right off. Took about 8 hours with a couple of AC breaks and hydration. Day 2 was the staining process. I used Olympic Cedar Naturaltone tinted waterproofer/sealant. It didn't spray well out of the pump sprayer so I brushed it by hand. I was spent on Sunday cuz of the heat so I had to finish it last night after work. I'm pretty happy and I love spending time out there. I wasn't proud of it before and got sick of looking at the mold so I finally got off my arse and did something about it. Here's the link to the product info: Good Stuff but not cheap $30 a gallon! It took a little over 4 gallons.
http://www.olympic.com/stain/Find_Pr...r_maximum.aspx |
Beautiful work!
It will hold up better too, being you brushed it in rather than spray it on. :) |
looking good Cap.....
Next time try some chemicals.....then you only have to rinse with washer.....mucho easier |
3 Attachment(s)
Looks good. Keep up with the maintenance yearly and it will last a long time... As opposed to the job we're doing now. 700 sq ft deck. <2 ft off the ground. One end sagged. They wanted to just resurface with composite. Instead, they are getting new deck, as the frame was rotted and not supported. I'll post shots tomorrow.
But here are a few of a new deck we recently completed in Beverly. Used ipe or ironwood for the decking. |
Quote:
Powerwashing only with water invites the mold problem to come back sooner than later regardless of the stain/sealer.Looks good now but he'll be doing it again much sooner than he thinks. |
Quote:
|
Quote:
What about small animals and children?:rotf2: |
Quote:
|
All times are GMT -5. The time now is 04:32 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 1998-20012 Striped-Bass.com