![]() |
Azek Deck & Railing Job
Customer wanted to use black balusters with the grey posts and railings for contrast. Bumped out section is for the gas grill. The decking in the foreground, under the roofed over section, is tongue and groove, to keep it dry below, where there is a slider that exits the walkout basement. Just finishing up this house....kitchen and stairs are done. We have a couple of houses over 5,000 sq. ft. coming up.
|
Nice and clean :btu:
|
Yep.
|
Classy JoB there- Nice Work!
|
Rich folk color scheme ,,,, :-)
I like it |
Quote:
Color scheme inside is similar grey walls and cabinets, with white counters. Pot filler above the $5,900 Wolf stove had to be lowered, then ceramic tile will be installed between countertops and upper cabinets. |
Wolf stove.....pricey but I like it.
|
1 Attachment(s)
White tops! Nice for a change.... I wonder how many years before folks start pulling granit out for something new... :huh:
My son and his guys replaced a local church spire yesterday..... Attachment 63627 |
Wow.!!...whoever got the job of unhooking that from the crane hook....has some brass balls.
Posted from my iPhone/Mobile device |
The whole process was filmed via a drone,,, I'll link it here when it's up.... He said he lost his breath a couple times when the lift swayed....
I get shook up just cleaning the gutters now! LOL. :spin: |
what is that line between the stove and hood. Looks like an afterthought.. Fire suppression ???
|
Quote:
|
Quote:
Framing condos on the cape, while i was still in my teens, my redneck boss noticed that I was pretty agile and not too afraid of heights so he assigned me the job of unhooking the roof trusses from the crane hook while perched on the top of the previous truss. Guys started calling me spiderman. :hee: A few years later I was injured in a staging collapse that fractured my hip and almost got me killed. After I healed I went right back to work doing the same job. No regrets but glad I made the transition over to being a finish carpenter.:cool: |
Quote:
Ross..I know you are very familiar with these. I quoted your post to answer Beetles question.:wave: |
Quote:
strip underneath the cabinets. |
Quote:
When I started installing the cabinets and saw all the extra outlets I assumed that the customer had asked the electrician to install them. They didn't! I have nicknames for all the subcontractors....I call the electricians the "Keystone Cops" |
1 Attachment(s)
A pic from the drone
Attachment 63638 |
Quote:
Quote:
|
Quote:
|
We are building a house on the Westport River.
In my wildest dreams, I would own the place and keep my boat right at the dock. The owner told me the floating dock was put in ten years ago. Five minutes to the mouth of the river. It will be his summer home. Three car garage, five bathrooms.......... Right now we are doing the flat rubber roof under a second floor deck. This job is moving at a very slow pace...might be here doing the finish in the spring. In which case I might be taking my boat to work:tooth: |
More pics.... the second floor deck above the dining alcove.
|
No gutters....
|
Quote:
|
Right..no gutters...so no gutters to clean. Overhang is 24" to the drip edge...to keep water away from siding. Gutters collect a lot of leaves then water backs up and causes too many problems. Less maintenance this way
Posted from my iPhone/Mobile device |
It was pretty cold the last couple of days but we got the rubber roofing done. We used tapered roof insulation to pitch the water towards the deck openings and away from the walls. It comes in 4x4 sheets....some sheets taper from 3" to 2" others 2" to 1" and then 1" to 1/2". The half walls are going to get lowered and then a short railing system on top to code height with full height railings at the openings. We will be trying a, new to us, deck system on top of the rubber roof.
Last picture is the front elevation of this "summer home"... the room over the garage is "Huuge" |
Quote:
|
That tapered stuff is the balls,,, nice job,,, I luv rubber :-)
|
Quote:
Cant really tell from the pictures but there are subtle "valleys" where the different pitches meet to direct the water out. We sub these jobs out usually but we decided we could control the quality better by doing it ourselves. |
We have a couple of large houses underway...along with half a dozen smaller houses. This one will have five full bathrooms, three fireplaces, three car garage, five bedrooms, custom stairway and balcony, Kitchen cabinets are being custom built......$$$$$
The jobsite was a sea of mud this week after the snow melt and rain. We go in after the framers are done to "fine tune" (fix) things. Picture from the second floor balcony over looking the great room. This will be my fourteenth year working for this company.....I have worked with the same three good guys, carpenters, the whole time. No new hires since I started, which is unusual in construction.....most other places, workers come and go, like through a revolving door. |
Quote:
|
All times are GMT -5. The time now is 12:10 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 1998-20012 Striped-Bass.com