![]() |
2nd coat of etex question
Anybody know about how long I should wait to do a 2nd coat of etex clear coat? Was hoping to avoid scuffing with a gray pad and rely mostly on a chemical bond or whatever you want to call it.. Thanks in advance
|
I usually do it the next day.
|
Safe call no longer than 72hrs
|
Thanks guys!
Posted from my iPhone/Mobile device |
the next day is fine
|
All times are GMT -5. The time now is 05:52 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 1998-20012 Striped-Bass.com