| 
	
		
		
		
		 another shot of the bottom of the winders old and new 
 
and a shot with one new post set thru the floor and rebuild of the bottom 2 steps, there was more framing done after this shot. 
 
I had to change the rise on both sets so on this set I had to add blocking, on the back set I cut and sistered new stringers. 
		
		
		
			
		
		
		
		
		
	 |