For everyone's information on the dredging of Charlestown breachway. I was there on Sunday fishing and they were getting things ready for dredging. Pipe which was about 12 inches thick and about 1/4 mile long was run from boat launch and down the road to about 1st house on the road to the beach. Looks like they will be dredging soon. There was a machine that looks like it would do the dredging and the workers had a boat to motor around in. It looked like the pipe would be dumping the sand on the beach by the 1st house.
|