The plug building is slowing way down for me. I have a zillion things to do before the season starts. CLean, lube and replace drag washers on 8 reels, re-spool all of them with fresh braid. Replace a jillion hooks and split rings, front lower and upper ball joints on the blaze, new sneakers and front shocks as well for it too. New bearings and seals on the trailer for the skiff plus lower unit lube and plugs for the motor not to mention pulling the prop to grease that shaft and nut assembly and put in new pin and clip. Re wire the humming bird with new cable I just got. Paint and touch up on the boat and seats. Still have to figure out what reel to buy to replace the 16 year old Shimano GT-100 on my 8 foot St.Croix tidemaster conventional. I got to get busy!
