Quote:
Originally Posted by spence
So I'd assume there's more time waiting for stuff to dry than actual work...how fast could someone build a rod if they pushed it?
-spence
|
I can build 2-3 a day with no one bothering me (which rearly happens) and no designs black on black or 2 colors with out CP.
Then it takes 2 coats of epoxy at 7 hours each