View Single Post
Old 07-13-2006, 11:25 AM   #10
Swimmer
Retired Surfer
iTrader: (0)
 
Swimmer's Avatar
 
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
VB at least the flyover is mostly dirt and above ground! Wait till the build the chunnel under the canal. And what Ronnie said about the drinking on the job, oh boy. And what Flaptail said about engineers signing off on the work that creates a ceiling that criminals charges wont penetrate as high as Amorello. Amarello is in charge of those engineers. I would have liked to see them standing where the work was performed, so they actually new is was done to minimum standards. The engineers in the field couldn't have possibly been everywhere to have overseen everything they were in charge of.

Swimmer a.k.a. YO YO MA
Serial Mailbox Killer/Seal Fisherman
Swimmer is offline   Reply With Quote