When the company showed up to install the ceiling fasteners they were told it was a job for the steel workes, they had no idea how this system worked and in drilling the holes for the fasteners they hit all kinds of rebar and cut the bolts short and epoxied them in. this is not how the system was designed to work. to hold a 3 ton slab of concrete you need a certain lenth bolt with the correct mix of epoxy. it all came down to the steel workers union saying it was there work and that no nonunion labor was to be used on that work site. the person who made that change should be hung
|