View Single Post
Old 03-25-2007, 08:33 PM   #18
Van
zoom
iTrader: (0)
 
Van's Avatar
 
Join Date: Apr 2002
Location: Quincy
Posts: 4,145
DONE !!!!!!!!!!

Installed all new gaskets and seals--prop, main shaft, shift rod, carrier, and all the orings. Put on the new water pump, and pressure tested from the top oil overflow and the "all new" bottom plug. Held 14 psi in both directions !!!!

Filled her with oil and she is ready !!!

Just got to touch up the paint on the cone and install, bring on those basses !!!!!!
Attached Images
File Type: jpg comp~1.JPG (96.1 KB, 26 views)
File Type: jpg carrier~1.JPG (74.3 KB, 23 views)

~..~..~.. ><((((º>
Things done at the last possible minute are done with the greatest possible information. Procrastination is, therefore, the most efficient means of doing things.
Van is offline   Reply With Quote