Quote:
Originally Posted by basswipe
Bob,the unions are the same size.
The oil company wants around $180 to do this.Looks to easy to cost that much.They wanted $140 for the part and $40 labor.
|
180 sound right, but I would have thought 140 labor and 40 part. That seems to be the ratio when I have something done.