View Single Post
Old 03-30-2010, 06:27 PM   #3
JamesJet
Registered User
iTrader: (0)
 
JamesJet's Avatar
 
Join Date: Aug 2006
Location: Melrose MA
Posts: 587
I've been able to channel the water to the pump with lengths of 1X2 PVC trimboard. Put a bead of caulking under to seal it to the uneven concrete. I'll pull it up after the water subsides.

That is a very good idea, i might do the same as I have some spare Azec laying around
JamesJet is offline   Reply With Quote