You want to make a hole in the floor 24 inches down or the depht of a 5 gallon bucket
then take a 5 gallon bucket drill alot of 1/4 to 1/2 inch holes in it
then line the bottom of the hole in the floor with crushed stone,
set the bucket in the hole you dug and level it
surround the bucket sides with the crushed stone and cement in place level with the floor
|