One of my major issues is cutting into the slab.I have access to a core-bore drill but that thing is a little intimidating.
The other thing is this mish-mash of PVC piping,the height of the check-valve and adaptors from that to the actual outflow tubing.
I thought it was as simple as a hole in the ground,put pump,attach hose and be done.Apparently this isn't the case.
Last edited by basswipe; 04-04-2010 at 05:09 PM..
|