Plans call for 12 oz. cloth inside and out and 12 oz. biaxial tape on chines and keel. I can manage the job of doing the work with a space heater in my shop. Just not on these January days with high temps in the low 20's.
This is a pic of the finished boat built by another builder.
I plan on eliminating the cuddy and making it open with a center console.