Thread: More stairwork
View Single Post
Old 09-30-2016, 06:15 AM   #25
Rmarsh
Registered User
 
Join Date: Jan 2006
Posts: 1,698
Preparing the volute and newel post. There is a lot to getting the post height and rake angle correct. It is satisfying when all the calculations and layout work come together. The starting newel has a 1 1/2" dowel that extends down through the tread and riser to the floor. There are different ways to fasten it. This time I will lag bolt into the bottom of the newel post dowel from the basement.

Last edited by Rmarsh; 08-26-2023 at 05:56 AM..
Rmarsh is offline   Reply With Quote