Redlite
I set #5 rebars at all angle points, they are easy to set and will last our lifetime. I have cement markers but usually only set them as required for the town, takes alot of time to set them which in turn doubles the cost of the survey. I buy the bars in ten foot lengths and cut them according to the soil. The sandier the soil the longer the bar.
Posted from my iPhone/Mobile device
|