Originally Posted by Ian View Post
Thanks Ross, sound advice. With the holes being dug into the hillside, is 4' (frostline) still the depth? Or am I going to need to do some googling and math to figure out how slope affects frost line on hills?
Technically, it is 4' from lowest side of the excavation (hole). Measure 4' from bottom of your post hole digger and mark it with tape. It is deeper than you/I think, every time. The tape will save pulling out a tape measure numerous times to see how deep you are...trust me. Locally, I hit something immovable before 4' more often than not.