View Single Post
Old 04-17-2016, 10:35 AM   #6
Eric Roach
Big E
 
Join Date: Dec 2009
Location: Seabrook, NH
Posts: 681
I'm a low-yield builder as well and I like to complete them as fast as possible.

Waiting for the solvent to evaporate after sealing is easily the longest part of the building process, so I'm now sealing with an epoxy called Low V that contains 100% solids and no VOCs. With a little bit of heat to help the curing process, they are ready to prime within 24 hours.
Eric Roach is offline   Reply With Quote