View Single Post
Old 03-14-2019, 04:44 AM   #29
Rmarsh
Registered User
 
Join Date: Jan 2006
Posts: 1,698
The demolition filled four dumpsters...besides the kitchen there were 3 1/2 bathrooms totally gutted. Different crew.....my first day there was when the cabinets were delivered.

I had to ask about the soffit detail. The quality and attention to detail on the plans for the cabinetry is always lacking...no details or cross sections and nothing on elevations regarding the soffit/ceiling moulding connection.

I drew commercial millwork with autocad for several years, accuracy and detail was the name of the game....every measurement, horizontal and verticle cross sections, materials labeled, hardware specs all on the shop drawings. From the accuracy of the drawings, I made parts cut lists with exact measurements. The shop could then build the stuff without any head scratching.

Made some progress with getting all the appliances installed.

Last edited by Rmarsh; 08-26-2023 at 05:55 AM..
Rmarsh is offline   Reply With Quote