I think each 15 degrees of temp cuts the drying time of epoxy in 1/2. Put it in a warm room and turn on the heat. Also, as I understand it epoxy is not supposed to be fully cured (which takes longer than drying to the touch) before you recoat it....if it is you need to sand for adhesion (or so says the system three people). Provided the original mix is right, it will continue to dry after recoating. I'd guess waiting 18-24 hours at 70 degrees would be safe for most slow drying epoxies.
|