Quote:
Originally Posted by Pete F.
So you have 6/9 from the floor to the ceiling now which pretty much limits things esthetically. Bite the bullet, demo the floor, drop it as much as possible, add radiant and repour. You don't have to demo the whole floor leave the mechanical space, but I would put in a sump so I could pump it if needed.
|
I was trying to figure how to get radiant in there too, Pete... But since he said he is already cut into the hill, I would bet he wouldn't gain much if anything by chipping out the floor. The original builder probably went short on stone and concrete on the ledge. 50/50 call... If the sump were to be put on the uphill side, you would get an idea of floor and stone depth, assuming he doesn't hit ledge....