Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » Grumpy Old Pharts Board

Grumpy Old Pharts Board Gerritol, Ex-Lax, Immodium, Bad Breath - all requirements for the Grumpy Board

Reply
 
Thread Tools Rate Thread Display Modes
Old 07-01-2008, 10:24 AM   #1
Swimmer
Retired Surfer
iTrader: (0)
 
Swimmer's Avatar
 
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
Great day to start cutting the six cords

of log length wood thats been sitting in the yard for the last six weeks. I was only going to do half and save the other half for next year but I'm thinking that this winter I'll need it all. I am going to the store to get the obligatory 12-pack though before I start. Of course thier is a no-alcohol while your sawing the log-length wood in effect, but I'll be ready right after I'm done. When I was 50 I cut a whole load to length in four hours. I am 57 now so I have to estimate getting the job done time-wise is about four days.

Swimmer a.k.a. YO YO MA
Serial Mailbox Killer/Seal Fisherman
Swimmer is offline   Reply With Quote
Old 07-01-2008, 10:31 AM   #2
BigFish
BigFish Bait Co.
iTrader: (1)
 
BigFish's Avatar
 
Join Date: Apr 2003
Location: Hanover
Posts: 23,392
Send a message via AIM to BigFish
Frank.....wait until its a little warmer out! Good luck man!

Almost time to get our fish on!!!
BigFish is offline   Reply With Quote
Old 07-01-2008, 04:22 PM   #3
ProfessorM
Uncle Remus
iTrader: (0)
 
ProfessorM's Avatar
 
Join Date: Mar 2003
Location: Lakeville Ma.
Posts: 14,773
Good luck. I did 3 plus cords, cut down, lugged from woods, and then cut and split, last fall for upcoming year. I ached for a month. The lugging from the woods was the worst part. Still got another 25 trees left for this fall. I'd wait for some cooler weather for the majority of your slave labor.

"A beach is a place where a man can feel he's the only soul in the world that's real"
ProfessorM is offline   Reply With Quote
Old 07-02-2008, 11:36 AM   #4
Swimmer
Retired Surfer
iTrader: (0)
 
Swimmer's Avatar
 
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
Quote:
Originally Posted by ProfessorM View Post
Good luck. I did 3 plus cords, cut down, lugged from woods, and then cut and split, last fall for upcoming year. I ached for a month. The lugging from the woods was the worst part. Still got another 25 trees left for this fall. I'd wait for some cooler weather for the majority of your slave labor.

I just need it seasoned for November burning. Can't wait. I didn't get to far before I had issues with the saw. Wouldn't run high end. Replaced plug, received at advice from guy who does tuneups on them. Adjusted high end needle valve. Now its smoking. All the biggest trees are on top, so at least I'll get them out of the way first.

Swimmer a.k.a. YO YO MA
Serial Mailbox Killer/Seal Fisherman
Swimmer is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:25 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com