Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 07-09-2005, 09:02 AM   #21
Jigman
Registered User
iTrader: (0)
 
Jigman's Avatar
 
Join Date: Oct 2002
Location: Kentucky
Posts: 1,442
Quote:
Originally Posted by pops
how long does 2 ton take to dry ? does it yellow?
The 30 minute, 2 ton takes around 30 minutes to set up. It will still be tacky at this time. Usually need to let it sit for 24 hours before using the plug. I've used it on plugs in the past and not noticed any yellowing.

Jigman
Jigman is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:26 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com