Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 02-13-2017, 07:50 PM   #11
pbadad
Registered User
iTrader: (0)
 
pbadad's Avatar
 
Join Date: Dec 2002
Location: North Branford,Ct.
Posts: 7,671
Well I system 3 10 plugs first coat. Hung them with 2 heat lamps c lose by. They are already touchable . 9 hrs. Did 1 pike with KBS. 2 coats. 6 hr between. First coat was dry to touch , very little tack. Second coat covered a y voids and gave it a deeper finish. Also did a few bats while I had it out. Punched a small hole in b otto and resealed sith screw, the left over fi is will solidify around the hole helping to seal out air,. This stuff hardens with the co er on. They sell a b "burp" spray to replace e air in a i.le. argon. Nice t n I g with small hole you squeeze out just enough. Never used the screw method , (thanks J). Always repacked in a Mason jar and vacuum pa ked it. Real PIA. I'll keep post results of plug fi is and pot life in can.

Billy D.
pbadad is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 01:03 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com