Oh and for the $320 mill plus the additional cost over runs over time of about an additional $100 mill plus or minus $50 mill either way....its not going to make that much of a difference.....the highway is still just 2 lanes each way.
Oh and for the $320 mill plus the additional cost over runs over time of about an additional $100 mill plus or minus $50 mill either way....its not going to make that much of a difference.....the highway is still just 2 lanes each way.
But the bridges are just one lane. It's a classic bottleneck. Posted from my iPhone/Mobile device