Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Main Forum » Boat Fishing & Boating

Boat Fishing & Boating A new forum at Striped-Bass.com for those fishing from boats and for boating in general

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-19-2024, 07:57 AM   #11
Rockfish9
Registered User
iTrader: (0)
 
Rockfish9's Avatar
 
Join Date: Jan 2007
Location: Reading Mass/Newburyport/merrimack river
Posts: 3,749
The Plas-core honeycomb deck Deck panels have been glassed on the bottom with 2 layers of 1708 and bonded to the cross members, stringers and hull, and tabbed in, it will get glassed over this week end with 1 layer of 1700, then a layer of 1.5 ounce mat, then a layer of 6 ounce cloth - all the hatches have been cut in, I'm in the process of making a custom one for the battery box/compartment. I pulled all the wires for my pot hauler, nav. lights and trolling motor on the starboard side before I close it off with a soffit, it will have a 4" deck plate inspection hole but it's a lot easier now,
fuel tank
has been pressure tested for leaks to 3psi - all through hulls have been installed, those through the transom have been over drilled, filled with thickened epoxy and redrilled to the proper size, I re-enforced the through hull area with 3 layers of woven roving sandwiched between 1.5 ounce mat, the scoop was reinstalled and bedded in 5200, the sea cock plate was dry fit, marked then bedded in 5200, it has captive tee nuts countersunk in the base to facillitate the bolting of the flange, the secock, has Rector seal on the male threads and the base is bedded in 4200 - bilge pump,wash down, bait well pumps as well as the high water alarm are wired to a busbar that will be connected to the harness from the front, once wired, the bus is slathered in di-elcectric grease to seal out moisture a and air.
the casting platform in the bow has been divided into 2 sections instead of 1, a Plas-core stringer has been glassed in for additional support and as a divider.
Attached Images
File Type: jpg deck.jpg (336.3 KB, 14 views)
File Type: jpg Bow deck - Copy.jpg (96.0 KB, 14 views)
File Type: jpg 20240414_112117 - Copy.jpg (117.6 KB, 13 views)

A good run is better than a bad stand!
Rockfish9 is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:00 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com