Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Rod Building

Rod Building So, you've landed a nice fish on a plug you made, eh? Now, the next step, building your own RODS!

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-08-2008, 09:09 AM   #5
SeaWolf
Registered User
 
Join Date: Mar 2001
Posts: 842
sunlight has nothing to do w/ making the finish cure faster or slower. epoxy curing is a chemical reaction. although, the temperature at the time of application does help in making the epoxy flow better and setup slower or faster, but it really does not change the overall cure time. by putting it in the sun, you are actually adding unnecessary UV to the finish, which does actually dry out and flatten the appearance of rod finish epoxy. the cloudy color could be due to the excessive heat you put to the finish and added additional bubbles to the finish and possibly even overheated the finish. a week is usually a good amount of time to wait for a rod finish to cure, especially if you are using one heavy coat of finish. with aftcoat, you could even wait 2 weeks before using a rod.
SeaWolf is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:30 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com