Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Rod Building

Rod Building So, you've landed a nice fish on a plug you made, eh? Now, the next step, building your own RODS!

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-16-2009, 01:53 PM   #4
numbskull
Oblivious // Grunt, Grunt Master
iTrader: (0)
 
numbskull's Avatar
 
Join Date: Nov 2005
Location: over the hill
Posts: 6,682
I think each 15 degrees of temp cuts the drying time of epoxy in 1/2. Put it in a warm room and turn on the heat. Also, as I understand it epoxy is not supposed to be fully cured (which takes longer than drying to the touch) before you recoat it....if it is you need to sand for adhesion (or so says the system three people). Provided the original mix is right, it will continue to dry after recoating. I'd guess waiting 18-24 hours at 70 degrees would be safe for most slow drying epoxies.
numbskull is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:44 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com