Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Main Forum » Conservation Issues and Notices

Conservation Issues and Notices A new location to post Conservation Issues and Notices in place or or in addition to discussions on the Main Stripertalk Forum

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-01-2010, 07:41 AM   #15
Swimmer
Retired Surfer
iTrader: (0)
 
Swimmer's Avatar
 
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
Quote:
Originally Posted by JohnnyD View Post
At current prices of fuel and electricity, reports state that the price of electricity will stay relatively the same yet the wind farm should provide most, if not all of the energy needs for the Cape.

Unless I've misunderstood some of the reports, the price per kW/hr will be negotiated before construction can take place. Someone please correct me if I'm wrong.

All the reports I have read stated 30 % plus more in costs. In the neighborhood of $.27 per killowatts hour. I think we are in the low to mid teens right now on cost per killowatt hour.

Swimmer a.k.a. YO YO MA
Serial Mailbox Killer/Seal Fisherman
Swimmer is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:10 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com