Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 07-07-2012, 08:41 PM   #10
stripermaineiac
Registered User
 
Join Date: Jul 2004
Location: Buxton, Maine
Posts: 1,727
Well thanks for the vote of confidence. There are others way ahead of me that know how to work with this stuff better than I do. My 1 concrete rule is don't rush it and make sure to wait at least 24 hr to 48hrs for propper drying time. especially when the humidity gets up there.I use a very good dehumidifier an then hang by the furnace to dry for the whole time as this adds a bit of heat. I hear many of the problems included with"I painted them or coated them the next day". The girls in the craft stores all mix water based an spray cans in their project. They're way ahead of us in some of this stuff.
stripermaineiac is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:10 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com