Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 11-29-2012, 08:38 PM   #4
ecduzitgood
time to go
 
Join Date: Oct 2007
Posts: 2,318
Ice and water sheild from drip edge up full width of roll any less is a wast of time. Facia should extend about an inch beyond soffit acting as a drip edge. No ice and water sheild on either just the roof. If your not re-roofing it really isn't worth doing unless your comfortable splicing the row of shingles into the existing shingles mid roof to replace the 4'+ of shingles fellt etcetra down to plywood sheathing (ice sheild must adhere directly to the sheathing). you remove to install the ice sheild. I went with better insulation in the attic and installed the ice dam cable. Measure the length and roof overhang so you can check the chart for proper length of cable on the box or web. Frost king
Posted from my iPhone/Mobile device

Last edited by ecduzitgood; 11-29-2012 at 08:48 PM..
ecduzitgood is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 10:32 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com