Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-14-2015, 10:13 AM   #1
Eric Roach
Big E
 
Join Date: Dec 2009
Location: Seabrook, NH
Posts: 681
Second Coat of E-Tex Questions

I refinished a plug for someone and had some pitting problems on the E-Tex topcoat. I lightly sanded the raised epoxy around the pits and sprayed the area with E-Tex Spray Sealer to cover the exposed paint and seal over whatever caused the epoxy to pull away. My hope is that a second coat of epoxy will fill the pits satisfactorily to make the lure presentable.

I've never done two coats of epoxy before, and I've never tried to correct a pitting problem. Might this work? What should I do to prep the first coat (if anything) to give the second coat the bast chance of finishing well?

If this doesn't work, it's back to square one via Jasco Epoxy & Paint Remover.

Any insight welcome.

Thank you,

Eric
Eric Roach is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:33 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com