Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Rod Building

Rod Building So, you've landed a nice fish on a plug you made, eh? Now, the next step, building your own RODS!

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-12-2009, 04:05 PM   #1
Brian L
Registered User
iTrader: (1)
 
Brian L's Avatar
 
Join Date: Mar 2007
Location: Franklin Ma
Posts: 402
Epoxy?

Hi Guys,

How long will/can you let your first coat of rod finish dry before adding the second coat?

Got a new 1205 conventional turning right now, finish has been on since 10 AM. I've been waiting a whole day for coat 2, but I'd like to get a jump on it so I have a shot to use it on Monday night. (I like two days drying for the final coat with the AFTCO finish)
Brian L is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:55 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com