Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

Reply
 
Thread Tools Rate Thread Display Modes
Old 04-17-2016, 10:35 AM   #1
Eric Roach
Big E
 
Join Date: Dec 2009
Location: Seabrook, NH
Posts: 681
I'm a low-yield builder as well and I like to complete them as fast as possible.

Waiting for the solvent to evaporate after sealing is easily the longest part of the building process, so I'm now sealing with an epoxy called Low V that contains 100% solids and no VOCs. With a little bit of heat to help the curing process, they are ready to prime within 24 hours.
Eric Roach is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:58 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com