Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-21-2018, 01:45 PM   #1
piemma
Very Grumpy bay man
iTrader: (0)
 
piemma's Avatar
 
Join Date: Nov 2003
Location: Rhode Island
Posts: 10,530
Blog Entries: 2
Stone work

Just finished 100 sq ft of slate on a cement wall. Actually 4' x 25' and I did a staggered brick pattern with 12 x 12 slates.

Doing 100' of cobblestone edging around a stamped concrete walk tomorrow. I just figured out that cutting trees is easier than stone work.

No boat, back in the suds.
piemma is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:33 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com