After a long 3 weeks of installing pipe on the roof of an 7 story Hospital, in 80 to 95 degree weather I have 10 days off until I get back to it on my return,
We had a crane pick yesterday I loaded the roof with 450 feet of 6"schedule 40 steel pipe, 220 feet of 6" schedule 80 steel pipe & 3" schedule 80 steel pipe, Valves, fittings Pipe stands hangers & hardware it was a long hot day (oh btw 6" schedule 80 steel pipe weighs over 70 pounds a foot, they come in 21 footers )
Then went back at 9pm for a water shut down I got home at 6:30am
We rented a house at Monument Beach for the week I can't wait to do nothing but relax and have fun
|