Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 03-01-2005, 09:39 AM   #4
Slipknot
Super Moderator
iTrader: (0)
 
Slipknot's Avatar
 
Join Date: Aug 2000
Location: Middleboro MA
Posts: 17,125
It varies with the different manufaturers of epoxy, but generally, if it's within a day or so, then just apply it, more time between like 2 days or 3 then I would scuff it.

I always scuff between but I take my time and never get the second coat within a day or so, so that is why I scuff. If I had the choice I'd recoat within 24 hours.
Slipknot is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:10 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com