Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Main Forum » StriperTalk!

StriperTalk! All things Striper

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-13-2005, 08:13 AM   #2
ejk002
Registered User
 
Join Date: Mar 2005
Location: RI
Posts: 31
There was some talk on the SNESA email group and I got this from an older post. If you look back on the messages you'll find more discussion on this topic.


Frow what I understand, they're supposedly going to dredge the big sand bar/flat to the west of the channel in the pond. This dredging is "habitat restoratation" for eelgrass, and is to remove all the sand brought in because the breachway was made permanent, and the "catch basin" inside the breachway was never dredged. The shallows east of the channel in the pond will be untouched.

The link to the group is http://groups.yahoo.com/group/SNESA/
ejk002 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:56 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com