Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 03-08-2009, 06:37 PM   #15
ecduzitgood
time to go
 
Join Date: Oct 2007
Posts: 2,318
Progress

Thanks to the warm weather I was able to get the main color sprayed today. It only took 4 attemps before I was happy and the airbrush did not spit. I have decided to paint the upper portion slightly different this time after looking at hundreds of images of herring,so I sealed this coat. I will scuff it before the upper color, I hope to spray it soon weather permitting. Then install the eyes and top coat with envirotex lite while its on the spinner using heat to eliminate any air bubbles before it sets up(for those of you that can paint in a climate controlled area this should complete the build).

ecduzitgood is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:11 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com