Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 12-31-2012, 07:02 PM   #22
m+mhammer
Registered User
 
Join Date: Feb 2009
Location: attleboro ma.
Posts: 32
adding a second story

I did it 25 years ago. 36x26 2x6's walls new floor joist( you don't what to be walking on your ceilings) and rebuilt 2 chimneys. Got 4 bed rooms and a full bath. I used electric heat. At the time i had forced hot air furnace. I would have had to replaced the furnace. also would have had to find 18sq. and 24sq. area for ducts. I was pretty lucky because i worked with some carpenters at the station. Not cheep but cheeper than a general contractor. Got it buttoned up. Then took about 18 mo. to finished. Don't forget new electric panel and the heating system. Good luck either why. Mike
m+mhammer is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 09:42 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com