|
 |
|
|
|
 |
|
 |
|
StriperTalk! All things Striper |
 |
|
12-16-2013, 10:11 AM
|
#1
|
Retired Surfer
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
|
Third CCC bridge proposed
On 1030, wbz, this morning a news report was given that stated a third bridge is being considered next to the Sag that would cost, 320 million (hahahhaha), and be a toll bridge as well as turning the Sag into a toll bridge, whose tolls would pay for both bridges upkeep.
|
Swimmer a.k.a. YO YO MA
Serial Mailbox Killer/Seal Fisherman
|
|
|
12-16-2013, 10:38 AM
|
#2
|
Registered User
Join Date: Jul 2004
Posts: 10,295
|
why don't they just finish the tunnel?
|
|
|
|
12-16-2013, 12:12 PM
|
#3
|
BigFish Bait Co.
Join Date: Apr 2003
Location: Hanover
Posts: 23,392
|
It will never happen! A second bridge will only cause more traffic having it merge back onto rt 6 off the bridge??? To make it viable they would need to widen the highway for miles and miles in either direction otherwise it will be a waste of money....just plain ignorance thinking out loud on their part!! 
|
Almost time to get our fish on!!!
|
|
|
12-16-2013, 12:35 PM
|
#4
|
Jiggin' Leper Lawyer
Join Date: Oct 2000
Location: 61° 30′ 0″ N, 23° 46′ 0″ E
Posts: 8,158
|
I wonder whether those idiots took the time to think about how they could charge a toll for crossing a structure owned by the US Govt. (the present Sagamore bridge)?
|
Wise men speak because they have something to say; Fools, because they have to say something.
|
|
|
12-16-2013, 12:47 PM
|
#5
|
........
Join Date: Apr 2002
Posts: 22,805
|
flying cars is a better alternative
|
|
|
|
12-16-2013, 01:02 PM
|
#6
|
Registered User
Join Date: Oct 2005
Location: Westport
Posts: 841
|
Quote:
Originally Posted by BigFish
It will never happen! A second bridge will only cause more traffic having it merge back onto rt 6 off the bridge??? To make it viable they would need to widen the highway for miles and miles in either direction otherwise it will be a waste of money....just plain ignorance thinking out loud on their part!! 
|
I think I heard that the plan was to have each bridge carry one direction of travel...
Posted from my iPhone/Mobile device
|
|
|
|
12-16-2013, 01:24 PM
|
#7
|
Uncle Rob
Join Date: Apr 2006
Location: Cheshire, CT>
Posts: 139
|
CCC Bridge
The Fed's won't allow tolls on all bridges to CC. there has to be at least one toll fee. Such as Jamestown which is another island.
|
|
|
|
12-16-2013, 01:33 PM
|
#8
|
Registered User
Join Date: Aug 2002
Location: RockVegas
Posts: 3,228
|
This state can't afford to build it in the first place. It'll never happen.
|
The future ain't what it used to be. --Yogi Berra
|
|
|
12-16-2013, 01:49 PM
|
#9
|
...
Join Date: Jan 2004
Location: MA/RI
Posts: 2,411
|
Solution: Find another time to cross the Sagamore and Bourne bridges other then peak times.
Posted from my iPhone/Mobile device
|
|
|
|
12-16-2013, 02:56 PM
|
#10
|
Registered User
Join Date: Feb 2003
Location: Hyde Park, MA
Posts: 4,152
|
Quote:
Originally Posted by BigBo
This state can't afford to build it in the first place. It'll never happen.
|
That's just it...THEY can't , but they figure that since we live and travel there, then WE should pay for it!!!
Sounds like some flunky looking to sound "important" to his/her superiors, proposed this half-arsed idea without doing ANY research.
You know, the "I'm just the idea man, someone else has to solve the traffic/building/cost problems" kind of idiot.
In other words: business as usual for this state!
Propose it, sign all the documents, get all the permits, issue all the contracts and THEN figure out how WE will pay for something that will be the new "Big Dig"!!!!
|
I am a legend in my own mind!
|
|
|
12-16-2013, 03:05 PM
|
#11
|
Jiggin' Leper Lawyer
Join Date: Oct 2000
Location: 61° 30′ 0″ N, 23° 46′ 0″ E
Posts: 8,158
|
I read that their target price for this was $320 million, which includes a connector from 25 to the "new" Sagamore bridge. And the eminent domain compensation to all of the private property owners whose land these projects will cross.
I'm thinking $3.20 billion is more realistic.
$320 million won't even cover the court challenges, from environmental groups, NIMBY-ists, and all of the others who'll run right up to Boston to file the Federal court claims.
I wonder if they even ran this plan, and the "toll" idea, past the State Reps and Senators from the Cape districts? You know, the folks whose constituents will be paying that toll 10 months out of 12.
|
Wise men speak because they have something to say; Fools, because they have to say something.
|
|
|
12-16-2013, 03:06 PM
|
#12
|
BigFish Bait Co.
Join Date: Apr 2003
Location: Hanover
Posts: 23,392
|
Quote:
Originally Posted by BMEUPSCOTTY
I think I heard that the plan was to have each bridge carry one direction of travel...
Posted from my iPhone/Mobile device
|
Point being....to disperse 2 bridges of traffic onto the same piece of highway that currently exists will not work.....it will only cause more traffic without widening the highway in both directions....thats the problem more or less....not so much the size of the bridge. Its never gonna happen!
|
Almost time to get our fish on!!!
|
|
|
12-16-2013, 03:13 PM
|
#13
|
Jiggin' Leper Lawyer
Join Date: Oct 2000
Location: 61° 30′ 0″ N, 23° 46′ 0″ E
Posts: 8,158
|
Quote:
Originally Posted by BigFish
Point being....to disperse 2 bridges of traffic onto the same piece of highway that currently exists will not work.....it will only cause more traffic without widening the highway in both directions....thats the problem more or less....not so much the size of the bridge. Its never gonna happen!
|
On-Cape travel all crosses the "new" bridge. Off-Cape crosses the old bridge. Won't be any worse than it is now. In fact, it'll be better because all 4 lanes of the old bridge will carry off-Cape traffic, not just two. They can make the first lane a dedicated merge lane from traffic coming off 6A, too. That merge now causes a lot of the Rte 6 back-ups coming off-Cape.
It's going to create a bottleneck the other way when the traffic coming down 3, and the traffic coming off the new "connector" funnels down to 2 lanes past Market basket, but it may eliminate the back-ups on 3 to past Cedarville.
|
Wise men speak because they have something to say; Fools, because they have to say something.
|
|
|
12-16-2013, 03:14 PM
|
#14
|
Certifiable Intertidal Anguiologist
Join Date: Feb 2000
Location: Somewhere between OOB & west of Watch Hill
Posts: 35,270
|
I saw this today too - doubt it will happen.
Quote:
Originally Posted by Uncle Rob
The Fed's won't allow tolls on all bridges to CC. there has to be at least one toll fee. Such as Jamestown which is another island.
|
Interesting - though for Aquidneck Island they now will have Tolls on both the Jamestown side and the Tiverton side so while Jamestown has a way, A.I. does not.
|
~Fix the Bait~ ~Pogies Forever~
Striped Bass Fishing - All Stripers
Kobayashi Maru Election - there is no way to win.
Apocalypse is Coming:
|
|
|
12-16-2013, 03:47 PM
|
#15
|
Registered User
Join Date: Sep 2003
Location: Libtardia
Posts: 21,692
|
Quote:
Originally Posted by JohnR
I saw this today too - doubt it will happen.
Interesting - though for Aquidneck Island they now will have Tolls on both the Jamestown side and the Tiverton side so while Jamestown has a way, A.I. does not.
|
wrong!!
|
|
|
|
12-16-2013, 04:02 PM
|
#16
|
Retired Surfer
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
|
Quote:
Originally Posted by PaulS
why don't they just finish the tunnel?
|
What have I been driving through?
I have to stop eating those brownies Raven gave me!
Posted from my iPhone/Mobile device
|
Swimmer a.k.a. YO YO MA
Serial Mailbox Killer/Seal Fisherman
|
|
|
12-16-2013, 04:04 PM
|
#17
|
Retired Surfer
Join Date: Dec 2000
Location: Sunset Grill
Posts: 9,511
|
Personally I think another bridge is do-able. One two lane on and one two lane off. Like Larry posted though the work on the feeder roads will cost as much as the bridge.
Posted from my iPhone/Mobile device
Last edited by Swimmer; 12-16-2013 at 05:17 PM..
|
|
|
|
12-16-2013, 04:46 PM
|
#18
|
Registered User
Join Date: Feb 2004
Location: RI
Posts: 5,704
|
Love this thread.As a Tiverton and Portsmouth resident....I just love this thread.Love the "It'll never happen","The Feds won't allow it".....
....and my favorite "I wonder whether those idiots took the time to think about how they could charge a toll for crossing a structure owned by the US Govt."
It happened here and it'll happen to you if don't get up off your asses and stop it now.
Lived this already.Gonna sit back and watch the fireworks.Have fun CCers because all you have is a massive uphill battle which you will more than likely lose...now is the time to act because if you hesitate a moment you're definitely gonna lose.
|
|
|
|
12-16-2013, 04:48 PM
|
#19
|
BigFish Bait Co.
Join Date: Apr 2003
Location: Hanover
Posts: 23,392
|
Quote:
Originally Posted by Mike P
On-Cape travel all crosses the "new" bridge. Off-Cape crosses the old bridge. Won't be any worse than it is now. In fact, it'll be better because all 4 lanes of the old bridge will carry off-Cape traffic, not just two. They can make the first lane a dedicated merge lane from traffic coming off 6A, too. That merge now causes a lot of the Rte 6 back-ups coming off-Cape.
It's going to create a bottleneck the other way when the traffic coming down 3, and the traffic coming off the new "connector" funnels down to 2 lanes past Market basket, but it may eliminate the back-ups on 3 to past Cedarville.
|
Mike...re-read the part where I say the biggest problem is the existing highway system.....thus your bottleneck theory.
|
Almost time to get our fish on!!!
|
|
|
12-16-2013, 04:50 PM
|
#20
|
Registered User
Join Date: Sep 2003
Location: Libtardia
Posts: 21,692
|
I agree with Basswipe… and i have heard that the State reps were told that if they voted for the guaranteed loan for Shilling's video game company, that the state would not put in a toll on the suck on it bridge.. but look what happened!!! This state is so corrupt.
|
|
|
|
12-16-2013, 04:51 PM
|
#21
|
BigFish Bait Co.
Join Date: Apr 2003
Location: Hanover
Posts: 23,392
|
Oh and for the $320 mill plus the additional cost over runs over time of about an additional $100 mill plus or minus $50 mill either way....its not going to make that much of a difference.....the highway is still just 2 lanes each way.
|
Almost time to get our fish on!!!
|
|
|
12-16-2013, 05:21 PM
|
#22
|
User
Join Date: Jun 2012
Location: Cape Cod
Posts: 5,515
|
The connector between 3 and 25 would work for me,,,
Oh! And a new bridge just for pickups pulling boats 😎
|
|
|
|
12-16-2013, 05:30 PM
|
#23
|
Registered User
Join Date: Sep 2003
Location: Libtardia
Posts: 21,692
|
Quote:
Originally Posted by BigFish
Oh and for the $320 mill plus the additional cost over runs over time of about an additional $100 mill plus or minus $50 mill either way....its not going to make that much of a difference.....the highway is still just 2 lanes each way.
|
But the bridges are just one lane. It's a classic bottleneck.
Posted from my iPhone/Mobile device
|
|
|
|
12-16-2013, 05:32 PM
|
#24
|
Certifiable Intertidal Anguiologist
Join Date: Feb 2000
Location: Somewhere between OOB & west of Watch Hill
Posts: 35,270
|
Quote:
Originally Posted by Nebe
wrong!!
|
Wrong in that what was posted above applying to Jamestown but no Aquidneck, right?
|
~Fix the Bait~ ~Pogies Forever~
Striped Bass Fishing - All Stripers
Kobayashi Maru Election - there is no way to win.
Apocalypse is Coming:
|
|
|
12-16-2013, 05:36 PM
|
#25
|
...
Join Date: Jan 2004
Location: MA/RI
Posts: 2,411
|
A. I. has a way off with no tolls via Bristol bridge
Posted from my iPhone/Mobile device
|
|
|
|
12-16-2013, 05:49 PM
|
#26
|
Certifiable Intertidal Anguiologist
Join Date: Feb 2000
Location: Somewhere between OOB & west of Watch Hill
Posts: 35,270
|
|
~Fix the Bait~ ~Pogies Forever~
Striped Bass Fishing - All Stripers
Kobayashi Maru Election - there is no way to win.
Apocalypse is Coming:
|
|
|
12-16-2013, 06:45 PM
|
#27
|
Registered User
Join Date: Sep 2003
Location: Libtardia
Posts: 21,692
|
Never loose hope john.
Posted from my iPhone/Mobile device
|
|
|
|
12-16-2013, 07:48 PM
|
#28
|
Uncle Remus
Join Date: Mar 2003
Location: Lakeville Ma.
Posts: 14,773
|
I'll be too old to drive before that gets done.
They would be better off getting rid of the Bourne Rotary and going straight thru to Otis land with a direct connect to Rt 6 and 28 south and leave MacArthur Boulevard an exit, side road, for me to use for work down to the Otis Rotary. .Oh and I'll need a raise for toll payments
Last edited by ProfessorM; 12-16-2013 at 07:57 PM..
|
"A beach is a place where a man can feel he's the only soul in the world that's real"
|
|
|
12-16-2013, 08:12 PM
|
#29
|
Registered User
Join Date: Feb 2004
Location: RI
Posts: 5,704
|
Quote:
Originally Posted by Redsoxticket
A. I. has a way off with no tolls via Bristol bridge
Posted from my iPhone/Mobile device
|
Excellent observation.I'm pretty sure THAT point will be brought up in all the town meetings in the surrounding communities.Trust me...it will.
Can't wait to see this thread 10yrs from now.Babes in the woods... 
|
|
|
|
12-17-2013, 06:55 AM
|
#30
|
........
Join Date: Apr 2002
Posts: 22,805
|
Quote:
Originally Posted by ProfessorM
I'll be too old to drive before that gets done.
|
lmao heh heh we can drag you behind the car on a skateboard
but will provide you safety tape streamers .... so other motorists will see you... 
|
|
|
|
 |
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -5. The time now is 02:33 AM.
|
| |